Wednesday, July 17, 2013

House Update: Kitchen

After - appliance garage and pull out drawer for bins
So, the first big thing we did on the house was have some work done on the kitchen in April.  We had a contractor (Vail Builders) push back the wall in the kitchen (reducing the size of the adjacent bedroom, the library), and add in additional kitchen cabinets on each side.  One side is the pantry - lots of wide, deep shelves.  The other size includes a pull out drawer for the trash and recycling bins, and an "appliance garage", along with some extra shelving.  It was an expensive project that took about four weeks to complete, but it certainly adds a bit of space to the kitchen, and that was one of Megan's complaints about the house.  It also added room for us to open our freezer door completely.  We then painted the kitchen red.
Before


After
After 


Pantry

No comments: